Our projects
Discover some flagship projects completed in Cameroon
Industrial water treatment system — ATC
Complete installation of primary treatment system (iron removal + bactericide) followed by 1000 L/h reverse osmosis for African Trading Company at the Port of Douala. 1 m³/h capacity, NC207 standard compliance.
60m borehole + water tower — TEKENDO
Drilling of a 60m deep borehole in Ø150mm with Grundfos SP pump, reinforced concrete water tower H=6m and 3000L PVC tank for private residence in Douala BP Cité.
100m hand pump borehole — Massagam Community
Drilling of a 100m hand-operated pump borehole (HPB) with bedrock drilling, reinforced concrete water tower and 3-tap public fountain for the Massagam community in the West region.
100m solar borehole — Nkondjock
100m deep borehole equipped with a hybrid solar Grundfos 1.5HP pump (TDH 120m), 5 panels 320Wp, 5000L tank and complete accessories for agricultural operation.
Hotel water treatment — Sky Kenko Hotel
Installation of complete treatment system (Birm + activated carbon media filter, pH dosing pump, post-treatment analysis) for the Sky Kenko Hotel in Kribi.
Industrial 150m borehole — KEDA
150m deep borehole using down-the-hole hammer for KEDA Cameroon Ceramics. Industrial submersible pump, steel superstructure, guaranteed flow rate for industrial use.
Industrial borehole maintenance — Nestlé
Complete maintenance of the Nestlé borehole: pump removal, air-lift cleaning, chemical treatment (aluminum sulfate + bactericide), physico-chemical and bacteriological analyses, recommissioning.
Cooperation HPB boreholes — GIZ
Drilling of hand-operated pump boreholes on behalf of GIZ (German Cooperation) — 120m on bedrock, HPB equipment, concrete superstructure, international standards compliance.